Within a research project (funded by the German Federal Ministry for Transport, Building and Digital Infrastructure) the system was developed, design and prototypes have been built. In this context, a number of construction details for fugues and reinforcement technology have been solved. The carrying capacity has been proven with numeric methods as well as experiments. So far, no test outside the laboratory has been conducted.